Answer Posted / renaissance holdings and devel
Its not BDF Flooring,Its VDF Flooring,Vaccum Dewatering
flooring for smooth floor finish by using Vaccum dewetering
Machines.
| Is This Answer Correct ? | 34 Yes | 0 No |
Post New Answer View All Answers
Describe the role of independent Quantity surveyor?
Who built the sears tower?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What are the disadvantages while using stone dust as filler in pavements?
How many are the types of joints?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
Give me an example of a time when something you tried to accomplish and failed.
Why is concrete cube test carried out?
Why is the statue of liberty made of copper?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
rate analysis for cement pointing 1:4 , for 100 sq m
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Prepare a Schedule for a Highrised building from starting stage to Handover?