What is OLTC in a transformer, specify its fuction.
Answer Posted / tse-wang
All answers are correct and more closely the answer No.3.
However, i am not comfortable with the fuction of the OLTC
described here in the forum:
The function of the OLTC (On-load-tap-changer) is to
maintain/regulate the output voltage of the transformer.
(This is general answer).
Technically, we are trying to change the winding turns
ratio (N2/N1) to change the mutual induction between the
two (or may be 3) windings.
| Is This Answer Correct ? | 28 Yes | 12 No |
Post New Answer View All Answers
What are the specifications for getting approval of Substation?
You are of electrical field and you are going for software? Why
if you are in a software company,then why do you want to come in a core company like sail, ntpc(where lots of trouble like tension but you have a good life in a it company) ?
What is the de rating factor of cable? What is the importance of the de rating factor in cable select
Why synchorised generators are used for the production of electricity?
how to calculate compresor capacity?
Single line digram for 11 kV to distribution use go,la and do
What is EHT tariff or Power factor Tariff ????
what is the difference between STAR and DELTA connection and application wise how it can be utilizedd
hello friends.. I have a doubt regarding the operation of dc machines.. I studied in a text book that a dc machine can be used as a generator and as a motor.. is this possible? If so,please send me the info about this topic.. you can also send your info to my mail.
In constant power region of 3-phase IM torque-speed characteristics, if frequency increases slip A does not alter B decreases C increases D none of above
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?
Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.
Can 33kva/415v transformer be run underground? If the answer is yes why and if the answer is no why?
how to calculate kvar in Akiva