Answer Posted / lavanya
line joining the places with same seismal intensity
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how clculate excavated or backfilling quantity by simpson's rule
residential buildings,mixing of concrete,structural,construction material,site handling.
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How to do rate analysis for concrete work including shuttering work?
What is a tensile strength? What is the tensile strength of wood?
How many Sft of Level Plaster per Kg
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
What expenses counted in contingencies and how much it is in related to built-up area of the building.
mix design procedure for 1:6 cement mortar
what is meant by csr in foundation? what is sbc?what is meant by contour line?
What is semirigid connections?
How much quantity water should be placed in one cubic meter area?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
How to calculate 1 brss for RCC work
what are the proper pipes for salt water line