what are the checks to be performed while fixing a door and
a window frame..at site??

Answer Posted / sjtbehera

1. allingment
2. plumb
3. properly fixed
5. type of joints
6. fixing of masala in joints

Is This Answer Correct ?    13 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is diversion tunnel in a dam?

691


Explain what is Critical Path Method (C.P.M)?

675


where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

766


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1766


can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density

1698






what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

1739


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

1798


explain the advantages of total stasion

1677


What Are The Different Type Of Slump Test Indications?

815


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

1610


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2626


Why does the pressure increase under soil?

651


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1098


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

1542


Are you ready to relocate with your immediate family to United States as a new employee?

4872