Answer Posted / himanshu
beacause total loop resistence is 250ohms.
so 24VDC supplied loop 1v corresponds to 4mA
and 5v corresponds to 20mA.
HART PC communicates to 1-5VDC only.
As explained in above answer 4mA is LIVE ZERo.
for 20mA reason is above 20mA current can be hazareous for
fieled.(fire).like HC and Refineries
thats why 20mA signal is used.
| Is This Answer Correct ? | 9 Yes | 4 No |
Post New Answer View All Answers
Why do you want to work here
Valve positioner and actuators in detail.
need to calculate flow rate with the help of dp range and orifice bore dia and size. range is 0 to 400 inwc and orifice size is 12 inch 150 # rf and bore dia is 7.180 inch. need to calculation for flow rate
Differentiate between ultrasonic flowmeter and radar type flow meter
how to calibrate and troubleshooting of leveltroll?
I want to measure and control level in tank of size 10*5 filled with gasoline, so plz give me the solution with clear details. how to select transmitter and sensors.
I was working on calibrating turbidity transmitters endress+hauser at effluent polishing plant.We calibrated using NTU buffers.What happened is that when we immersed the sensor, everytime we raise and lower the sensor gradually, the reading will vary.my question is that is there any specifications on what is the required distance from the bottom of the container with buffer to the face of the sensor?Is it ok to install the sensor in a medium which has turbulence specially if bubbles are present?
god evening sir i am studying m.sc(tech)electronics &instrumention.am i elegible to all industies
How would you choose differential range?
How to work togather like sov,limit switch,proxy switch and booster in xv
any questions on motor and energy conversions machines?
What is difference between Ionization heat and bimetallic heat
Q-Explain the different load conditions that will produced different offset which may or may not be acceptable to thhe control function
how to design orifice plate?what is the equation?
Isometric drawings are generated during _________________ phase of a project