Answer Posted / sakthi
THIS IS THE FINAL BASE COARSE OF TOTAL STRUCTURE,AND
TRANSFERS THE LOAD UNIFORMLY TO THE GROUND FROM THE ABOVE
STRUCTURE.
| Is This Answer Correct ? | 6 Yes | 6 No |
Post New Answer View All Answers
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
it is a corrected question." make a list of engineering property(properties) of soil.
Explain the mechanism of cavitations in pipes and drains?
how much cement and sand required for 100sqm of wall plastering in different proportions
What do you mean by the word 'shear'?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
types of piles detail,
psc girder detail
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
How do you maintain water pressure?
What is the use of array command?
What is meant by autocad?
How to construct a water sump in a rocky soil?