Answer Posted / sakthi
THIS IS THE FINAL BASE COARSE OF TOTAL STRUCTURE,AND
TRANSFERS THE LOAD UNIFORMLY TO THE GROUND FROM THE ABOVE
STRUCTURE.
Is This Answer Correct ? | 6 Yes | 6 No |
Post New Answer View All Answers
How to do rate analysis for concrete work including shuttering work?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
what is moment-curvature relationship in semi rigid connections??
Explain what is change order request?
Explain major difference between auto level and dumpy level?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Define What is diversion tunnel in a dam?
How many days should curing of plastering, brick work and concrete
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
why +1 to be followed for calculating the no of bars in BBS. Please explain
Define Workability ?
how can we calculate steel value, depending on load
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...