WHEN I AM CONNECTIN TWO ELCB IN PARALLEL.ONE ELCB
TRIPPED...HOW IT HAPPEND??
Answer Posted / arvind
when you are connecting two ELCB parallel then its mean the
voltage between these will be same but not the current, so
which ever ELCB is connected to higher current side is
getting trip if the current is flowing greater than the set
value.
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not
All tape of electrical questions Answers tape of motor transformer e.o.t crane
what are the disadvantages in GIS over AIS
How to back charge the Gas turbine generator
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
where was current transformer protection units used and why??
What is VSCF windelectrical system?
PLZ EXPLIN ABOUT CLASS PS CLASS CT .WHY THEY R DESINED AND FOR WHAT PURPOSE?WHY OTHER CT CANT BE USED AS PS CLASS CT? EXPLAIN IN SIMPLE LAUNGAGE IF POSSIBLE PLZ GIVE CIRCIT DIAGRAM?EMAIL-RAJ_SINGH_0376@SIFY.COM
how do we calculate length of starting time and repeated starting of a direct online starter?
why does the magnetic balance tests at transformer?
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss
what percent do you derate your copper wire when you change from copper buss to copper wire
how to generator maintenance (A Check, B check,Etc)
what is the function of statics switch in ups and tell me parts