1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / matu singh chauhan
one mason bricks works in foundation and plinth level with
cement motor = 1.25m3 per day
bricks works in structure with cement motor =1.00m3 per day
plastering in a one days=10 m2 per days
| Is This Answer Correct ? | 477 Yes | 71 No |
Post New Answer View All Answers
what r the precaution for high in atp tempareture,low in atp tempareture
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
How is improve my knowledge in construction industries....
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
how to identify the failure of building by expansive soils
The foundations are placed below ground level, to increase?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
What is difference between engineering stress and true stress?
what is constat for brickwork
who to find building iron rod strenth
What will you do if a portion of load bearing wall collapses under your supervision?
Form where IS456 is adopted in 1978?
What do you mean by the word 'shear'?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?