Answer Posted / anil kumar vaddi
Gantry girder is a concrete or steel member of short
cantilever span to take heavy loads. (such as crane, rails
etc)
| Is This Answer Correct ? | 55 Yes | 19 No |
Post New Answer View All Answers
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
What is thumb rule in quantity and cost estimation of a residential building?
how many time use of plywood shuttering and IS code
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
What is the use of array command?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Why should you show Client/Engineer activities clearly on the project plan?
What is the per cu. mt. price of ready mix in Gujarat region.?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
List out some of the common problems that architect have to tackle it?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
roll of DLC in road constructions
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)