Define the various stages of the project planning process in construction.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
The concrete slump recommended for beams and slabs; is?
How to check slab shuttering level.? Or check list for slab ?
what is difference between fluidity and workability also how palsticizer works
what is difference between GTS bench mark and temporary bench mark
what is the exact dia of 8swg and 10swg gabion wire
roll of DLC in road constructions
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
how is the reinforcement is distributed in triangular slab
What is meant by solid geometry?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.