When geneartor is running in poor lagging side power factor
its excitation current increases then it is running in
improved lagging side.Kindly tell me when gen is running in
leading side what will happen
Answer Posted / asif raza
MY DEAR FRIEND AS WE KNOW THAT, ALL GENERATOR ARE DESIGN TO PRODUCE THE POWER WITH LAGGING P.F,SUPPOSE IF WE INCREASE MORE EXCITATION CURRENT TO THE GENERATOR'S ROTOR FIELD, THE P.F WILL BECOMES LEADING & ARMATURE REACTION WILL TAKES PLACE DUE TO THE EFFECT OF STATOR FLUX ON ROTOR FIELD.SO YOUR AVR WILL LOSSES THE CONTROL OVER ALTERNATOR & YOUR WINDING WILL DAMAGE.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Electrical 'C' license full abbreviation , and full form
How we can recongnise the phase displacement of transformer connection between primary & scondary...plzzz explain it with example.........
A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.
What is Diff btw Fire Alarm & VESDA System???
How we calculate the Multiplying Factor of Kwh meter for 3 phase alternator.
which type of motor is used in automatic swing gate
What is the effect of atmospheric pressure & Temp; on efficiency of motor? Why NGR(Neutral Grounding Resistor) is used in 132/11 KV Transformer & how? What is the use of Auto T/F in Grid Station?
WHAT IS ELECTRICAL MAINTAINTENCE ?
For refrigerators the motor current is raised beyond its rating on both conditions when the voltage of the system is more(say 270v) than the rated voltage(220v) as well as when the voltage of system is less(say 160v) than normal voltageof 220v, why explain?
5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch
HOW TO DESIGN THE body EARTH cable(Copper Conductor) size for 60KVA UPS?
In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks
Define cuttoff frequency?
PLEASE INFORM ABOUT THE IDEAL TEST RESULTS OF MAGNETIC BALANCE TEST OF TRANSFORMER 33/11 kv DELTA-STAR T/F