Answer Posted / nagori salim
Vol of 1 bag of cement = 50/1440
= 0.0347 cumec
For 1 cumec = 1/0.0347
= 28.818
= 29 bags
| Is This Answer Correct ? | 17 Yes | 2 No |
Post New Answer View All Answers
what is the basic difference between Coloumn & Shear Wall
How many litres of water used for curing of 1000sqft of slav
What is OSHA compliance?
What do you mean by bond? What are the different types of bonds?
how many digree of freedom in four bar chain
What is factor not to be taken in consideration in mix design?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
how clculate excavated or backfilling quantity by simpson's rule
how to calculate the concrete mix m30 by volume
how much repeitation for conventional and maivan formwork?
States some of the commonly used commands in cad software’s?
What are the advantages of cad software?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
whou haat goals do you have in your career
What is structural frames or systems?