Answer Posted / satbir singh bhatia
Civil Engineering is a branch which help the nation to
develope and stand in the world with proud. I want to
dosomething for the developement of nation. So i choose be
an Civil Engineer.
| Is This Answer Correct ? | 208 Yes | 25 No |
Post New Answer View All Answers
Explain the different types of roofing systems?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
what energized you to complete your course?
What is need for setting limits?
what is flashing?
how to estimate material requirement for an area of house in square feet?
what is Short bored pile foundation.
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
What Are The Steps Involved In The Concreting Process, Explain?
What are wooden shingles?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
what is called Bulk Density of aggregate?
how to caliculate required amount of cement and sand required for 1cu.m.
How will you Engage Labours on Site?