why circuit breaker closing time is always higher then
tripping / opening time.
Answer Posted / prabhat kumar sinha, banswara
Whenever a Loaded circuit breaker is interrupted an arc is
inevitably formed between the contacts. But in the closing
time there is no current carrying by Circuit Breaker and no
any other effect on contacts. So, circuit breaker closing
time is always higher then tripping/opening time.
Is This Answer Correct ? | 34 Yes | 22 No |
Post New Answer View All Answers
I have c license but I don't know eligibility of Max Kilo Volts under the electrical licensing board.
in control scheme dc logic wiring commonly using negative loop,what is the reason?if we use positive looping what will happen?
Whether power factor should be high or low? Why?
What is highest size of HT motor like 11 kv or 33 kv,and how to make it 750 rpm.i think the size will be very big.any idea ? pl. reply..
What is the Surge suppresor? Why using in a UDB's and How it works?
star delta starter contorl circuit... drawing..
I have experienced electrical maintenance HT ,but I completed be ECE ....can I apply c license or not ???? Pls help me friend s...
What's mean HVF & HAF in Vacuum Circuit Breaker?
What are the basic properties of signal flow graph?
my bachelors was done with EEE now i got admit in NU with CS as course. how to answer this qns 1) why u choose cs? 2) why u changed from eee to cs
in wind mill use 2100 kw asychronous generator ( induction generator ) rotor voltage : 3300,stator voltage : 690, rpm : 1511 type : MRL063E04 ' we check rotor resistance magger value found following. R-EARTH - 00 M.OHM,Y-EARTH-34 M.OHM,B-EARTH- 33M.OHM R-Y: 31 M.OHM, Y-B: 00 M.OHM,B-R :33 M.OHM HOW CAN I TAKE DECISION?pls ans. quickly
state types of reflectors in illumination engg. ???????
What are the conditions to be satisfied for parallel operation of dc generators?
Why we use duplex coil and hook switch in telephone system?
I need to connect a synchronous generator to the grid using automatic synchronization and two circuit breakers (one for synchronization, one for end connection to the grid), how to determinate the required diameter of the cables?