In pile foundation which kind of action are take place?
Answer Posted / moula
end bearing action & friction action
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What is dead load impact load live load
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What is change order request?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
What is the usage of zoom command?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What was asked in isro civil interview
What are the uses of layer?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
What is the difference between built area and super built up area?
What is the meaning of a blue land surveyors flag?
what is the max. area can we apply the plate load test ?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa