What is defect life cylce
Answer Posted / murali krishna
1. Once user report the defect with status as New
2. Business expert will analyze the defect and accepts its
a defect then it comes to Assigned State
3.Assigned user will analyze the defect he is able to
reproduce then he will try to fix and change the status as
Fixed. suppose he is unable to reproduce then developer
will assign status as Clarification Required.
4. Suppose bug state as clarification required then tester
needs to give more information regarding this defect.
5. Suppose defect status as Fixed then Dev manager will
check the code and changed the status as Fix Verified and
assign back to Testing Team means testers (who raised the
defect)
6. Once release the new build then testers will test the
application, suppose application is working fine then
tester will close the defect. Status as Closed.
7. Still user is getting the same defect in new build
status as : Fix Rejected.
what ever steps mentioned above wil vary company to company
or defect tracking tool to tool. But the entire defect life
cycle is the same but status will change.
If any queries pls contact same id...
Regards,
Murali.
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
What is an entry criteria?
What is a bug triage?
what is the technical challange you faced in your module.please ans me the question i just want example can me any example please very important
what is the testing approach for windows Explorer(Not IE Explorer)
how to write defects in excel sheets when defects occured
There is an opening in our organization Sierra Atlantic, Hyderabad. All Manual test engineers with 2-3 years of experience can forward your resumes to mah_cs82@yahoo.com before May 01, 2008. (Only manual testers) with a covering letter, current CTC and Expected CTC.
Manual and automation how do they help in bringing out quality product? Explain?
What is client server application testing?
If anyone have attended interview with deloitte for the post of senior manual test engineer. Please share the interview process and the questions asked. How to prepare for the interview. Thanks in advance
What is an exit criteria?
How do u determine,what to be tested?
what is data guidelines
What is formal testing?
How is ‘build’ different from ‘release’?
Difference between adhoc testing and error guessing?