How to calculate the Water cement ratio of reqiured
compressive Strength of concrete?

Answer Posted / prakash choudhari

From Water cement Chart,
First you get what type of cement you used & than comapire
with your target mean strength of Concrete from chart you
get W/C ratio, which helps you to get Qty of Sand &
Aggregate

Is This Answer Correct ?    30 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can you provide a link for manual design of building?

1116


Define What are the uses of Groynes?

720


significance of specific surface area of particles?

1773


LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

1603


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3321






if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1686


How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm

1001


What is the distance between railway tracks?

685


Floor tile measurement? Wall to wall or skirting to skirting

1361


PL.tell me about civil engineering questions with answer

2107


Formula of area of crane hook

1514


What is meant by solid geometry?

630


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

1651


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1694


What in your past experience or education prepares you for the position for which you are applying

1689