check list of maintenance of transformer?
Answer Posted / latika
For Power Transformer:-
1] Insulation test [P-N,S-N & P-S]- Yearly
2] BDV of Oil [top and bottom sample]- Yearly
3] Topping up of Oil if reqd.
4] Opening of all stud connentions cleaning of connectors,
washers, replacing damaged ones and reconnecting properly
both in HV and LV sides.
5] Conditioning the earth electrodes [ both body and neutral
earthings] i/c the continuty made by flats or copper wire,
tightening of joints if any, watering [weekly] in case of
hilly lands.
Beside that any urgent requirement like heavy oil
leakage, any generation of extra heat etc are to be attended
immediately.
| Is This Answer Correct ? | 19 Yes | 2 No |
Post New Answer View All Answers
what are symmetrical and non symmetrical components in electrical installation.
Meaning of ingrace protection for motor.for ex IPXY
i have faced a problem in ro plant grunfos make bm30type pump it is 22kw pump. We start this pump using siemens 3rw 4423-ibc44, 30kw softstarter but this soft starter will frequently failier so we planed to change dol starter. So pls tell anybudy its possible or not.
list the type of vfd? wich is sutable for heating kiln?
hi frnds what is meant by harmonics & what is meant by third hormonics,where its will occur ?thank u
What is the IS standard for MCCB to be use (As per capacity of AMP)& for ACB also.
Why phase sequence must be same in any ht motor or generator circuit?if phase sequence doesn't same whatever will be affect on circuit?
a 230v transformer with step down ratio 19:1.it has 2000turns on primary and rated 25va calculate max primary current no of secondary turns volts/turn
What is the difference between PLC and Embeded system
I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in
how to do the ductor test?
What is force on parallel conductors ?
How can we find out LT UG cable fault (size,from-4*25mm sqr to 4*300mm sqr)? How mani types UG cable faults?
Give atleast 20 alternating current apparatus and devices.
how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you