how to calculate quantity of steel & concrete in stair case
Answer Posted / zuhair shams
we calculate quantity by
area of waist multiply by thicknes of waist it will give us
the volume of waist
then number of steps multiply by tread multiply by riser
multiply by stair width and the total ove 2 it will give us
the volume of steps
and are of steel we know it from design drawing
| Is This Answer Correct ? | 35 Yes | 11 No |
Post New Answer View All Answers
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
please briefly explain calculating or estimating steel quantity for a RCC column?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
what is the use in canals of longitudinal drains and cross drains in lining areas?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
what is the use of water bar in water tank and is this an extra item in estimate?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
Why are steel plates inserted inside bearings in elastomeric bearings?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
What do you mean by tolerance factor of concrete ?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL