Why is the earth socket in an electrical plug outlet made
thicker and lenghty?
Answer Posted / rahul
earth fault more adverse with respect to phase fullt to
servive in heating effect earth fult hole for the earth
socket in an electrical plug outlet made
thicker and lenghty?
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
How to do bus bar short circuit calculation for 230KV/11kv, 60 MVA Substation?
If a 3 phase induction motor is in off condition in the conveyor and rotor of the motor keeps moving with the conveyor than the resistance of windings of motor varies. why is it so ??
For some transformers we are using solid neutral earthing while some others we are using resistance earthing why ?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
How to measure power in 2 or 4 or n phase circuit? Please give me a formula.
in my working site. momentary jerck in electrical supply ocurred frequently which cause of multiple losses in our electrical equipements. how can we protect our electrical machines and equipements in this situation.
Why we use mho Relay in long transmission line?
in india per day how much power is generated including all power station
write circuit diagram for a motor rotate in forward direction once it started and when pressed the same button it should rotate in anticlockwise.
What is referred to the electron in the outer orbit?
How to test REF relay testing for LV panel as per Kahramaa standard?
Why r u using pf panel. what the uses
What is the angle of inclination for the oil connection from transformer conservator to Bucholz relay and why?
Explain with example of functional requirements of protection relay in terms reliability, selectivity, sensitivity
sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....