I read the answers given for 90 percentile calcutaion in
the analysis report. If i am running a test for 1 record
how is the 90 percent calculation done.
Answer Posted / arbind kumar
Suppose you have 10 sec. for 90 percentile for
transaction "ABC". It means that 90 percent of the "ABC"
transactions have taken 10 sec. or lesser time during the
test execution.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
When the loadrunner controller open the winrunner file then what is the location of the winner configuration file?
Hi all, I am having an interview on LoadRunner (SAP Web Protocol). I am wondering if somebody can help me with some interview questions at a 2 yr Scriptor level. Thanks and all answers are much appreciated.
How load runner interacts with the application?
What is report header and what are the information contains?
how to get current system time Loadrunner function?
How we tested remote servers if client is installed in another place
How do you identify which values need to be correlated in the script? Give an example.
How do you enable text and image checks in vugen?
What is loadrunner agent?
What are the information contain by script windows for each script in the list?
What is vugen recording and scripting?
What is the threshold level for think time and how can be this changed?
What are all the components of loadrunner?
How can we develop the database vuser script?
What are the information crating for each host?