Cost control in civil construction as well as Quality control
Answer Posted / mahendra mohan srivastava
In Civil engineering we can cost contral by save time. if
we have done our work with in time.
| Is This Answer Correct ? | 3 Yes | 8 No |
Post New Answer View All Answers
how to caluclate sienerge qty in construction in ap
why are you joining in this (applied post) job and your aim for this job
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Explain soil analysis?
What is Curtailing of R/F
How can you distinguish between sorption, absorption and adsorption?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Please design 12.5m long dubbly beam
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
For Wet Mix Mecadam design what is Optimum moisture content
What are the advantages of cad software’s?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is semirigid connections?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site