Cost control in civil construction as well as Quality control
Answer Posted / mahendra mohan srivastava
In Civil engineering we can cost contral by save time. if
we have done our work with in time.
| Is This Answer Correct ? | 3 Yes | 8 No |
Post New Answer View All Answers
Define What is Civil Engineering?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
What is the difference between yeild strength and compressive strength of steel???
roll of DLC in road constructions
how pumping of concrete effects the quantity of material used in it?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
why & what is perchatage we are using fly ash in concrete?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
how much shouid be the rate for ready mix concrete per cubic meter
explain the rale of the government in the construction industry
what is the permanent solution applied for restoration of leaning tower of pisa?
What are the applications of the modulus of elasticity?
what pressure the NP2 class RCC pipe can sustain?
What is zoning permit?