Cost control in civil construction as well as Quality control
Answer Posted / mahendra mohan srivastava
In Civil engineering we can cost contral by save time. if
we have done our work with in time.
| Is This Answer Correct ? | 3 Yes | 8 No |
Post New Answer View All Answers
what is difference between fluidity and workability also how palsticizer works
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
What is the primary difference between adsorption and absorption?
Difference between lime, distemper and plastic emulsion?
Prepare a Schedule for a Highrised building from starting stage to Handover?
What is meant by dimensioning?
Why concrete barriers have curved surface profiles?
What is the absolute pressure scale?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Why are steel plates inserted inside bearings in elastomeric bearings?
what are the challenges of being a team leader and a supervisor?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
What are the different theories of failure under static load?
What is difference between combin footing & rapt footing
How do you calculate reinforcement weight of steel?