Cost control in civil construction as well as Quality control
Answer Posted / aglawe chandrakant vasantrao
For cost contol in civil construction is most improtent
as well as quality control. In mix disign the strength of
the concret is improved by concret sefty factor,in mix
disign proper mixing & proper supervision.
| Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
which method is used in semi-rigid connection design??
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
How you can use different dimension tools in cad? What are the different dimensions available?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
How many are the types of joints?
Explain what is the release of lien?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
What is the exception critarea of cube?
How to calculate steel for beam slab and column
what is the name of shuttering oil used in oman
what is mean by reestimation?
Differentiate first angle & third angle projection?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?