Cost control in civil construction as well as Quality control
Answer Posted / ganesh purkar
FOR CONCRETE WORK GO FOR MIX DESIGN WITH MINIMUM CEMENT
CONTENT REQUIRED ,PROPER PLANNING NOT ONLY FOR EXECUTION
BUT ALSO FOR MATERIAL SUPPLY PART,PLAN THE BILLING
CYCLE,SEE THE WASTEAGE CALCULATION FOR ALL CIVIL
MATERIAL,PAY ATTENTION FROM BOTTOM LEVEL OF EXECUTION
TEAM,MAXIMUM UTILIZATION OF RESOUCES AVAILABLE WITH
YOU,LAST NOT THE LEAST PLAN FOR THE EMERGENCY SITUATIONS
ALSO.
| Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
Would you cause a 55-gallon drum of water to weigh more by climbing in?
what are the changes in concrete pour height as per IS 456, 2009?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
how to absorb to site basic corrections? which are the important correction?
How can we make a hole in a solid rectangle using solidsworks?
3. What are the disadvantages of your present job, things you do not like about it?
How high should the water tank be to provide a 60 psi at base of this water tower?
it is possiblee to produce concrete with out cracks...
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What are the uses of layer?
How to calculate the crank rod in slab