1.difference between sts & ats?
2.what is fm200 system brefly explain?
Answer Posted / shri..
2) Fm200 is fire fiting system, widly it is used in data
centers in this system hpptapluropophine gas are used.
Shriram
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Pl. share your experience about industrial-electronics repair of machine tool.
What will be the voltage regulation of a full load and 0.80 power factor lagging load transformer when a two winding single phase transformer has a voltage regulation of 4.5% at full load and unity power factor?
what does a k rating in a transformer means?
What are the parts in a inverter?
what is consequences of neutral and earth connect?
What is power relay?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
How many types of faults are there in 3 phase power system?
Give me the calculation steps to design an electromagnet to be work in 230V 50 Hz AC Supply. Also give force that is created by that electromagnet when it gets energized.
what is an unbalance in acircuit? in a three phase 3wire circuit how an unbalance will come? in a three phase four wire system how an un balance is coming?
the winding of Generator and Motor is star or in delta ? and why
What happens if the negative to earth voltage is greater than positive to earth voltage in the battery of substation?
How do I calculate a WTI CT ofa 1250kVA 6600/400V transformer
DEAR SIR,I GOT THE CALL LETTER FROM RRB, SECUNDERABD AS A JE-II SO PLEASE PROVIDE ME SOME MODEL QUESTION AND ANSWER PAPERS AND LAST YEAR QUESTION PAPERS
stand by earth fault protection (51G) for transformer rating 2000 kVA,Dyn11,33/0.400 V. LV NCT ratio and necessary resistor and metrosil values how to calculate