Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A superconductor is a

Answer Posted / ram

Its a metallic alloy or composite material that allows to flow
current without any resistance

Is This Answer Correct ?    13 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I got an interview call from CANARA BANK for the post of TECHNICAL MANAGER (MMG-II), Can any one tell me what are the questions will be asked?

2068


i am interested in refrigeration and air conditioning systems.please send me name of this type of company in baroda,gujarat.

1747


what is the use of choper motor in pyrometer ?

2070


what is the advantages and dis advantages of critical speed of turbine.

2024


sir, I am applied RRB chennai,for Section engineer (mechanical),Pls mail 2007,2007 & 2008 years solved question papers.My Mail Id:nathan_cs65@yahoo.com Thanking you

1995


What are the causes of liner high temperature?

1946


How does a modern submarine move?

1067


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1775


plz send me the aptitude test paper for hpcl.

1954


Why coupling should be located very near to the bearing? Why lap joint not recommended for tensile force?

2756


Which is the welding process you have carried out in workshop?

1096


What do you analyze from boiler water analysis?

2002


Explain about front drive mechanism in vehicle

1706


Is the hvac machines are designed 10% less than the electrical feeder value?

1686


How do I calculate 2% Butane in 29.66 CFM?

1381