Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

define B types and C types
in MCB ?

Answer Posted / k.veeresh

Type B - trips between 3 and 5 time full load current

Type C - trips between 5 and 10 times full load current

Type D - trips between 10 and 20 times full load current

Is This Answer Correct ?    57 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why water bubbles when D.C. Current is passed through it? Why not when A.C. Current is passed?

2155


Any one who apply for Ferro Scrap Nigam Limited cn join with me at rajuhalder@indiatimes.com or 09669717028

1977


what is self capacitance of inductor

2427


if a number of plc s are there then how many modbus to be used

1966


What is different between Difnit time and instatous over current relay

2554


In HI POT test what is reason for applying the AC VOLTS and DC VOLTS in different applications what is the nessesity for this ?

1939


why are u join ntpc

2172


what is the difference between circular wdg & ractangular wdg?

2064


how hydrogen cooled alternator undergo maintanence ? that is hydrogen when come in contact with air can result into explosions .

1920


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2820


how to interlock 3 incomer-ACB,1 buscoupler ACB,... pls answer this question and if possible send me the ckt diagram..haifriends2910@gmail.com

2921


what is the difference between an alternator and a synchronous motor

2029


Describe the colour rendering properties of i) tungsten filament lamps ii) tubular fluorescent lamp

3140


why is the conservator tank painted white on the transformer

3205


defination of controlled shunt reactor

2251