Why TAP changer provided in primary side of HT
transformer ? and why not in secondary?
Answer Posted / yash
1. at HT side current value is less as compared to LT side.
2. insulatin requirement is less
3. tap changing can be smoother and it would have fine
control as no. of taps are more(due to low current)
| Is This Answer Correct ? | 76 Yes | 3 No |
Post New Answer View All Answers
What is dielectric loss?
How we can calculate the consumption in kwh of motor on basis of kw @100% load, @50% load & @ no load.
what are the applications of PLC?
I WANT YHE TECHNICAL AND ELECTRICAL SPECIFICATIONS OF 2x4MW 11KV 2x10MW 11KV 2x25MW 11KV 2x100MW 11KV HYDEL POWER PLANT i.e PROTECTION SYSTEM,MONITORING,CONTROL SYSTEM,GENERATION,SYNCHRONISATION,METERING PLEASE SEND THE DETAILS TO MY MAIL ID SPRAVEEN_222@YAHOO.CO.IN
can we install HT panel & LT panel side by side or how much clearance is required ?
what is the defination of Cable database? What are the points are considered while preparing cable database? Is there any sample available for cable database?
what will be happen if earth point is being used for as a neutral point for raw power , and same will be used for ups earthing
my bachelors was done with EEE now i got admit in NU with CS as course. how to answer this qns 1) why u choose cs? 2) why u changed from eee to cs
oil cooled transformer
explain the what is a drive ? 0 4 which type motor r use in the celling fan..... PCB plannet 2 13 If stator & rotor of a 3-phase induction motor have different no. of poles, will the motor run or not?? types of drives Why dc supply is used for closing and tripping coil of ht breakers. What happen if we use only ups ac supply only. ACC 1 41 how the 3phase induction motor is running in 2phase supply with help of capacitor? 1 33 what is the actual difference betwen constructional details and constructional features? 1 20 how does commutator convert a.c to d.c?
any body,pls tell me how to done relay coordination ? how to coordinate by TCC curve?how to read the tcc curve?
What is the meaning of C1, C61, C91 cable
If not into production, how far did you follow the design and why did not you see it into production?
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
please give me solution to rectify the emi(electromagnetic interference)