Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

CAN WE ADD SOME EXTRA QUANTITY OF GYPSUM INTO CONCRETE?
WHAT PERCENTAGE WE CAN ADD? WHAT IS THE EFFECT ON STRENGTH?

Answer Posted / guest

Gypsum is a mineral. it is name in chemical is calcium
sulphate.Mainly it control setting time of cement.
generally it pecrentage 3%. Excess gypsum slow the setting
time. is not link with strength

Is This Answer Correct ?    24 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate volume of concrete & steel on tank foundation & ring wall ?

1558


How did street originate in the plumbing term street ell?

1010


what is the difference between np2 and np3 concrete mix

2051


How to find permissible diagonal tensile stress in reinforced brick work

2503


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2567


undistributed samples are obtained by

2379


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1796


give me the mix proportion for design mix concrete M 7.5 grade 1:4:8

4012


Civil engineering related

1949


What materials were used to build the golden gate bridge?

1285


If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

2152


How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

2058


How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????

2015


Calculation of curtain wall of box culvert

6075


Explain what is alternate bid?

1255