How you Confirm the Hard stratum for Driven cat in situ Pile
work?
Answer Posted / pvni
while driving a bore in soil with auger the soil which
comes from auger is tested at evry time.if it is like a
rock the sample is tested and find out how much strength is
having.
if it is enough to bear the up coming weight, pile should
be casted, or go for further driving.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
what is shuttering co efficient?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
what are the changes in concrete pour height as per IS 456, 2009?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
What is the difference between absorption & adsorption and sorption?
what is the types of surveying?which type of survey carrying for type of work?
What tor stands for in tor steel?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
pls tell me , what is the water content
Explain different types of rcc pipes.
How can we demolish concrete beams?
Which are the Steel tests ?
How many cement sand ballast in cc 1:4:8 40mm
what is thumb rule for calculating the size of ISMB required for a particular length of span
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?