DEAR ALL
I HAVE AN OPURTUNITY IN WORK IN AFGANISTAN?
MY QUESTION IS
WHAT IS THEPRESENT SAFETY POSITION IN AFGAN?
HOW IS THE COMMUNICATION AND BANKING FACILITIES IN AFGAN?
HOW IS THE CLIMATE ABOUT AFGAN?
ANYBODY KNOW ABOUT THE ABOVE DETAIL PLS TO SENT THE ANSWER.
IF YOU ARE INTRESTED TO SENT THE ANSWER PERSONALLY PLS TO
CONTACT MY MAIL ALSO. @ santhoshselvamani@gmail.com
Answer Posted / scorpion
why are u suicide, if u want eat pizza u go US
if u want eat frise u go france, if u want eat open air u
go hills station, and if u want eat lat-muka pls come here.
and altimetaly u want eat bullet so, u are going
AFGHANISTAN. by the way it's just joking.
Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What is meant by Crystal Concrete?
What is the purpose of the gap in the road on this bridge?
How to calculate chejja reinforcement
What should be the standard roof height like to be?
Define What is diversion tunnel in a dam?
How does siphoning work?
Describe the advantages and disadvantages of using plastic and timber fenders?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
may i know the detailed description of cutting length
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
How many are the types of joints?