For having nonavailablity of 10 Amps fuse, a lineman replace
the same with 5Amps two strand, Do he correct ?
Answer Posted / santosh kawade
No.
If 10 amps fuse not available replce the same with 5 amps
two strand is not correct.
Because while connecting two strands in parallel current
distribution between them will not be equal and if one fuse
fail above 5 amps the other automatically fails
subsequently.
Santosh Kawade
9224 69 3116
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
What is the temperature PROFILE OF A FLUID W. R. T. Distance from a sphere to which it is IN CONTACT which is at constant temp.?
what mean by analog ,digital,numerical meters and relays? say the example?
how does the rotating m.m.f is produced in the 3-phase induction motor and how the poles are created in 3-phase induction motor ?
plz send me the procedure and syllabus for mseb exam
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
for hipot test on 33kV busbar, we will test on 70 kV or 56kV, what is the acceptable leackage current?
how many synchronous motor are there in any power plant
How would you relate your key competencies to this position?
what is the earth current,reverse power,electrical trip generator short circuit,low voltage, high voltage please discribe me
What is difference between mcb and mccb.
how to test the electrical panel.ht lt mcc pcc.
i need mat lab program to find out the transmission line losses,regulation and losses
what is formula to cal cute earth pit numbers and size of earth strip used in earthing?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.