What is the benefit of making a cantiliver proped.?

Answer Posted / sruthi

to avoid bending

Is This Answer Correct ?    14 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the 0 value in quantity surveying

2480


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


material used for mendrel use to bend epoxy coated rebar

2245


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2240


What is the strength of 1:6:12 mix?

3159


I need to constructive work in amaraj batteries

1939


What is the per cu. mt. price of ready mix in Gujarat region.?

2429


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5529


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3239


While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

1672


how can we calculate steel value, depending on load

2444


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


400 ku d/c clearess ketan hota hai?

2124


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2237


can i get civil engineering test papers.......?????

2550