Answer Posted / nagori salim
Shear Key is provided at the bottom of Earth Retaining
structures to avoid shear failure.
Steel schedule is a tabular format showing steel details
such as shape of bar, length of each bar & total required
length, dia of bar, wt/m & total weight.
| Is This Answer Correct ? | 51 Yes | 2 No |
Post New Answer View All Answers
to minimize budget cost of building , what can i do
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
indian standard split spoon sampler
Calculation of Pier Cap with tapper area?
strength vs shape factor
Define What does civil status mean?
five benefits of using standard terminology in the measurement process
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
how can calculate cutting length of diamond ring
What are the disadvantages while using stone dust as filler in pavements?
How many square meter can mason layout chb per hour
Define What is the origin of name Railway Sleepers?
For the construction project what capital cost has to be taken in consideration?
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30