Answer Posted / nagori salim
Shear Key is provided at the bottom of Earth Retaining
structures to avoid shear failure.
Steel schedule is a tabular format showing steel details
such as shape of bar, length of each bar & total required
length, dia of bar, wt/m & total weight.
| Is This Answer Correct ? | 51 Yes | 2 No |
Post New Answer View All Answers
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What is factor not to be taken in consideration in mix design?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
Differentiate first angle & third angle projection?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
how can calculate cutting length of diamond ring
What are the different types of civil engineering?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
How do you convert wind speed into force?
what course did you consider thinking before you enrolled in college?