Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is shear key and steel schedule?

Answer Posted / nagori salim

Shear Key is provided at the bottom of Earth Retaining
structures to avoid shear failure.

Steel schedule is a tabular format showing steel details
such as shape of bar, length of each bar & total required
length, dia of bar, wt/m & total weight.

Is This Answer Correct ?    51 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is SDLC ?and write a 'c'program for to swapping the three numbers?

1863


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2734


How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

2212


What is the use of extruded feature in solidsworks?

1224


What are the materials used in building a gravity dam?

1106


What is the difference between Grade I, II and III of GSB?

2661


what is the painting co efficient of slope roof tiles?

1954


What Are The Steps Involved In The Concreting Process, Explain?

1331


detailed calculation of the amount of cement used?

2074


show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water

2074


Why should appointment store person for project ? what is the benefits for company ?

1127


How to find out slope footing concrete

2947


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2452


do we decide reinforcement steel , based on bending moment ? give example with continous slab?

2377


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

2129