If the client identified some bugs to whom did he reported?
Answer Posted / lakshmikantha b
He will report to the Project Manager. Project Manager will
arrange a meeting with all the leads (Dev. Manager, Test
Lead and Requirement Manager) then raise a Change Request
and then, identify which all the screens are going to be
impacted by the bug. They will take the code and correct it
and send it to the Testing Team.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the main benefit of designing tests early in the life cycle?
What is control chart?
tell some examples for driver and stub?
What Kinds of Testing should be followed for an web application while Manual Testing . Ie., Regression , Integration , Alpha , Beta , Performance , Stress ,Load , Back End(database)...etc What is the serial way to follow the above Testing Kinds in manual testing of any application. Plz clear my doubt.
Explain installation testing?
What is glossary of software qa/testing?
What is Functional, Non-Functional, and Regression Testing used for (i.e. the purpose of each)?
To test a function, what has to write a programmer, which calls the function to be tested and pass test data.
What is the term for decomposing a software program so that latent design information can be extracted? 1. Reengineering 2. Regression 3. Restructuring 4. Reusability 5. Reverse engineering
what is modular framework?
What is differences between SCS-1,2 and 3
Which types are testing are important for web testing?
what are Link Speed available for FCOE SAN?
Mention what are the categories of defects?
Could reviews or inspections be considered part of testing?