What is the quantity of cement, sand, and gravel to be used
in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand
(for cement please mention in kilos, and for sand and
gravel please mention it in CFT)
Answer Posted / guruprasad
1000mmx1000mmx1000mm =1 mx1mx1m = 1cum ok
M20 Grade =1:11/2:3
summation of proportion=1+1.5+3=5.5
1.54cum of dry materials of concrete will yield only 1 cum
concrete after adding water.
1cum x1.54/5.5= 0.28 cum
so cement=0.28cum= 0.28/.0347=8.07 bags=403.5 kg
sand=4.2cum=15.036cft
aggregate=8.4cum=30.072cft
| Is This Answer Correct ? | 41 Yes | 14 No |
Post New Answer View All Answers
how to calibrate the RM 800
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
What is absolute coordinates?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
if the nitrates more than 45mg/l in water lead to disease then what is it called
How to calculate quanty of steel in four leg stirrups?
Volume of 25kg putty bag & 40 kg putty bag volume??
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Where is the worlds longest elevator and how long is it?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how much cost of single coat 20mm thick plastering per sqre meter
what is the exact dia of 8swg and 10swg gabion wire
What is labor and material payment bond?
how much of the strength comes from post-production curing
How to calculate the force on a column of three story building. What should be the base concrete height?.