1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX?
2.WHAT IS MEANT BY STRUCTURAL DESIGN?
3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER?
4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM
THE LOAD COMBINATION?
5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP?
6.FULL FORM OF SPT & SMB?
7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT?
8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY?
9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND
REMEDIAL MEASURES?
10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH?
11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB?
12.WHAT IS MEANT BY GANTRY GIRDER?
13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB?
14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT
LENGTH?
15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR
SHUTTERING?
Answer Posted / sujit
Nominal mix is the some ratio are fixed by Is code india.
and design mixed is the ratio fixed by considering avilable
material, strength and enviornment.
2.Structural design means design a structure ( means
skeleton of a body ) of thing
3.spt- standard penetration text
Least count of theodlite is 0 degree 0 min 5"( second)
| Is This Answer Correct ? | 13 Yes | 8 No |
Post New Answer View All Answers
How to take labor charges for construction of 1cum of concrete?
what is diversion?
what discoveries did you have in relation to your course?
Explain what is the release of lien?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What is the effect of a building collapse?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
how to tie 10 legged stirrups
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
How did street originate in the plumbing term street ell?
natucher of concrete &type of concrete?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
Describe the advantages and disadvantages of using plastic and timber fenders?