1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX?
2.WHAT IS MEANT BY STRUCTURAL DESIGN?
3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER?
4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM
THE LOAD COMBINATION?
5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP?
6.FULL FORM OF SPT & SMB?
7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT?
8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY?
9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND
REMEDIAL MEASURES?
10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH?
11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB?
12.WHAT IS MEANT BY GANTRY GIRDER?
13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB?
14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT
LENGTH?
15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR
SHUTTERING?

Answer Posted / sujit

Nominal mix is the some ratio are fixed by Is code india.
and design mixed is the ratio fixed by considering avilable
material, strength and enviornment.
2.Structural design means design a structure ( means
skeleton of a body ) of thing
3.spt- standard penetration text
Least count of theodlite is 0 degree 0 min 5"( second)

Is This Answer Correct ?    13 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are your future hopes for this job?

1831


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1942


What is geopolymer based concrete?

2133


What is the zero value in quantity surveying

2009


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1666






Slab quantity 

1602


What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

1846


Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?

1560


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1360


How to marking the building

1490


what is detail procedure of eccentric footing? plz. give solved exmple?

1828


how to do cementicious paint for rcc walls of cw pump house

1539


How to determine spacing of bars in slabs or beams

1968


How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097

1753


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

1662