What is the difference between nominal mix and design mix?
Answer Posted / alok kumar jha
As per IS-456,nominal mix is Prescriptive type,means its
ingrediant ratio is fixed,more over the other parameters
like maximum size of Aggregate,w/c ratio,type of cement
etc.are also fixed,aiming that adherence to such
prescriptive specification will result in satisfactory
performance.
On the other hand,Designe mix is Performance based
concrete,where the properties of concrete like
strength,workability,durability etc. are specified and
ingredients ratio,maximum size of aggregate,type of cement
etc is user's choice.
| Is This Answer Correct ? | 69 Yes | 10 No |
Post New Answer View All Answers
How to calculate woden area in sft and Cft
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
what is called Bulk Density of aggregate?
How to take labor charges for construction of 1cum of concrete?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
on what basis the partial factor of safety are decided? form the load combinations
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
Why does the pressure increase under soil?
What are the different types of runners?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
What is the use of water table & Kreb stone for drain
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
what is the types of surveying?which type of survey carrying for type of work?