Why do we use steel in Column?
Why HYSD bar is preferable than plain bar?

Answer Posted / sjtbehera

steels are likely skeleton of our body. only concrete take
compression load but weak in tension. but steel is one of
the best reform to take care those load and strengthen
concrete to bear all kinds of load.

due to high yeild strength hysd bars are used for saving
steel.on account of increase in bond stress such bar
normally donot need end hook. transport, storage bending
and fixing charges are less than 35% cost of mild steel bar.

Is This Answer Correct ?    34 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Aptitude, reasoning, quants, verbal and technical question

982


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

1951


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2358


What is Refuse Area In High Rise Building ?

1487


what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

1655






Doul Bar reinforcement and details of drawing.

1917


The concrete slump recommended for beams and slabs; is?

749


How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/

1354


significance of specific surface area of particles?

1780


what could be the production cost of 1 cum of concrete by CP30 plant

1266


Test procedure of fly ash bricks as per code ?

2117


What is modular elasticity?

715


What is the release of lien?

683


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

1659


Reinforcement details at hinged joint

2685