Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why do we use steel in Column?
Why HYSD bar is preferable than plain bar?

Answer Posted / sjtbehera

steels are likely skeleton of our body. only concrete take
compression load but weak in tension. but steel is one of
the best reform to take care those load and strengthen
concrete to bear all kinds of load.

due to high yeild strength hysd bars are used for saving
steel.on account of increase in bond stress such bar
normally donot need end hook. transport, storage bending
and fixing charges are less than 35% cost of mild steel bar.

Is This Answer Correct ?    34 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the ingredient value of 40mm and 20mm aggregates?

1938


Does brick grows bigger every year?

1083


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1543


Mention what are the composition of a landfill?

1090


Explain major difference between auto level and dumpy level?

1128


how to determine H- zone in a column? where it will occur?

2147


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1894


How are freeway bridges built?

1204


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

2120


What is Critical path in Ms-Project ?

1132


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2810


what is the meaning of 40/20 src

6211


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1624


what is work of planning deptt. in any construction compny (in road project)

2396


types of piles detail,

2245