sir please send me previous year questions of jspl through
which i could prepare myself fpr the test.
Answer Posted / seshu
ir please send me previous year questions of jspl through
which i could prepare myself fpr the test
seshu019@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
How to convert 2 phase to 3 phase electricpower in induction moter?
how to measure the current by compact digital equipment with dislay which fit inside any equipment
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating
please anybody help me to find out the BHEL trainee Exam previous year questions papers . if u ve pls. send it to surekhared@gmail.com
How to calculate or formula to calculate rhe power in 2 phase system ??
What do you mean by phasors?
If I have 3 essential main switch board and 3 incoming electricity ,but only 1 genset running is that possible.
How to design the earth grid for lightning protection in an industry
33kv substation lay out details & line to line & line to earth measurements
whate is the meaning of balance/unbalance,in stabilizers type
How do i carry out or know the vector group of a Dyn1 and Dyn5 transformer
what is diff. between earthing grid,earthing mess, earting grid?
What is the reason that the humming sound is coming from the induction furnace panel?
why Induction Generators are not "Black start" ? and apart from WTGs where this types of generator are generally used?