Answer Posted / sanjay nayak
Due to burden is more than usual.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Where can I get CPWD electrical specifications & Shedule of rates? Please help me
I use 20 nos led tube 4feet, in pathway 100mtr approximate, so what size cable i use for lighting
how dia of wire and angles are calculated for overhead shielding wire to protect substation equipment from lightening strokes???
What is meant by analogous system?
what are the Alarm, Trip & Safety equipment (Issues) present in Power Transformers pls Mail it to ashokbabunhce@gmail.com
if we give 60 hz single phase supply to the transformer used in europe , than what will happen
What is inductance?
Sate maximum power transfer theorem?
whate is the meaning of balance/unbalance,in stabilizers type
Will an earth leakage trip be activated if the component or wiring is faulty on low voltage equipment.Example An electrical Cat Scarer placed in the garden and water gets into the wiring.
What is I to C?
A parallel flow heat exchanger will perform better than a counter flow heat exchanger. State if the statement is true or false.
why do we put a transformer on soak before loading it
where rlc series ckt used?
please give some hindalco placement papers for written exam