what is difference between inductive and reactiveload?

Answer Posted / m.ravi

a reactive load maybe inductive or capacitive

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can we calculate the ampacity of the electrical wire/cable. and what are the factors must be considered. pls. elaborate.

1753


hi this is hema can anyone mail me previous years questions for the APPSC-A.E.E (in electrical stream.) ......thank u.

1454


11000volt DG set carnt kaise banvay

1222


List some examples of renewable energy?

768


1. what is usage for power factor in industries?? 2.why we need to monitor power factor??

6691






A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2369


Do inductive loads have distorted current waveforms ?

1387


If the rated speed of a d.c. Shunt motor is1440 r.p.m, which method of speed control would you suggested to obtain a speed of 1500 r.p.m?

690


what are problems caused by the pdu in rack server

1455


What is the cut-off rate?

705


HOW CAN YOU CALCULATE PRACTICAL EFFICIENCY OF A ASYNCHRONOUS INDUCTIONMOTOR OF 7.5KW,& MOTOR IS RUNNING WITH AVOLTAGE OF 410 VOLTS,& TAKING CURENT OF 13 AMPS

1425


Actuality I have at home electrical panel with 220v 50hz, and I want to converter from there to 110v 60hz, to wiring on the half of my house. Also I like to keep another half of my house with the original 220v 50hz. What is the best and safety way to do?

1354


What is the most essential condition for the voltage build up for a d.c. Shunt generator?

664


hi friends ,iam working as genset AVR service engineer in electrical field from past 2 yrs throughout india . i plan to shift in some other job without travelling in same field because i con't travel,i dont know what i do for that so please guide me what job is suited for me,how i can serch the job please anybody helpme iam totally confused

1542


How to calculate of maximum demand if given 628kw, 785kva, 0.8 p.f.

1221