is tha integration testing include non functional test?
Answer Posted / mahesh h
Non functional tests are,
* Baseline testing
* Compatibility testing
* Compliance testing
* Documentation testing
* Endurance testing
* Load testing
* Localization testing and Internationalization testing
* Performance testing
* Resilience testing
* Security testing
* Scalability testing
* Stress testing
* Usability testing
* Volume testing
* Failover testing
which of course will not come under Integration testing. Right?
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
I have 2 yrs 10 months experience in manual testing. there is a gap of 3 yrs in between. just 3 months before i rejoined the same company. I am looking for new & better job.What I have to enhance my career to up level, should I have to do Automation course or any other. Guide me properly.
I know functional test cases are derived from frs and system design specs. But are test cases for performance, database, boundary, relational integrity and other types of tests other than functional tests created from frs and system design specs as well? When are these test cases created? Are they in the same test plans alongside functional test cases or is their a different test plan that includes these test cases?
What is a critical bug?
Does an increase in testing always improve the project?
Write 2 scenarios for System testing?
Assume a login page, and you have written 10 cases(say for example). How will you justify that these 10 testcase suffient for the login and how do you say this is 100% satisfies the need.
how to creat 2 test plan in 2 different environment exp:tour and travel
write test case for linked in sign up page ?
How we will do Memory Testing? There is any tool to do that testing and to whome this testing to be performed?
What are the interview question on insurance domain in manual testing
What is a test server?
1.Tell me negative test cases for notepad 2.Tell me the factors for for writing severity based test cases
If anyone have attended interview with deloitte for the post of senior manual test engineer. Please share the interview process and the questions asked. How to prepare for the interview. Thanks in advance
whats main working for tester. and developer, and prject manager.
On what basis you are fixing up the time for project completion?