Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answer Posted / kishore kumar

Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will
be
= 2x1.7x0.15 + (0.5-0.15)/3 x ((0.3x0.3+2.0x1.7+sqrt
((0.3x0.3)(2.0x1.7))
=0.981 m^3

Is This Answer Correct ?    98 Yes 37 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain moment of inertia and its importance.

655


pls tell me , what is the water content

1670


Calculation of Pier Cap with tapper area?

5761


hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1068


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

2771






Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

1915


Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

1802


Which prize is the alternative to the NOVEL Prize?

1877


What is meant by Crystal Concrete?

1267


Can we apply curing compound on ceiling (slab Bottom)

362


Define What is the origin of name Railway Sleepers?

818


What do you understand by “preset” during the installation process of bridge bearings?

667


What is aggregate?

725


What is the difference between shear and tensile strength?

656


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

1659