Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / kishore kumar
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will
be
= 2x1.7x0.15 + (0.5-0.15)/3 x ((0.3x0.3+2.0x1.7+sqrt
((0.3x0.3)(2.0x1.7))
=0.981 m^3
| Is This Answer Correct ? | 98 Yes | 37 No |
Post New Answer View All Answers
What is an ortho mode?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what is the difference between prime coat and tack coat in road construction
explain the advantages of total stasion
What is Architect-Prepared Contract?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Give me an example of a time when something you tried to accomplish and failed.
Who designed the city of washington dc?
What are the causes of building collapse?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What is meant by dimensioning?
How you can use different dimension tools in cad? What are the different dimensions available?
acceptance criteria for concrete works