if two bulb of 50w &30w apply in series having 230v the
which bulb glow bright ,why
Answer Posted / naresh.
p=v*i1 v=i1*r1
50=230*i1 r1=230/0.217
i1=(0.217A) r1=1059 ohms
p=v*i2 v=i2*r2
30=230*i2 r2=230/0.130
i2=(0.130A) r2=1769 ohms
obvious that one which is drawing more current has least
resistance path as it in series the current takes the least
resistance path and we can also see that 30w bulb has high
resistance so less curentt flows through it so it is less
brighter than 50w
conclusion:
so 50w bulb glows brighter
| Is This Answer Correct ? | 3 Yes | 6 No |
Post New Answer View All Answers
how to fit 3 HP crompton gear motor with conveyor with the use of staring delta starter or ordinary starter?
Usage of flywheel diode in relays
i am in need of AC SYNCHRONUS MOTOR 30KW. ANY ONE KNOWS THE MANUFACTURER OF SAME. ALSO MOSFET AC CONVERTER 20KVA CONT.OUTPUT.
Why it is necessary to isolate fire fighting when you are taking shutdown for lv board.
What is the simplest formula to calculate the rotor diameter of a synchronous generator?
What is the Good Earth resistance value of G.I & Cu. Chemical Earthing & Normal Pipe Earthing?
1))why we run three phase or three different circuit from a single conduit 2)) why not two circuit of different phase run in same conduit?? and why we run same three cicuit of same phae run in single conduit??
what is the meaning of 5% droop or 7% droop in AVR?
hi , i have 150 kw loud and we need 50 m cabil,i want to know wich size cabil we use. thanks
How to know about the rating(voltage and other) of induction motor if its name plate is missing at the manufacturing site.
How does HT work & Voltage required?
WE HAVE THE DC RECTIFIER 1500A, INPUT VOLTAGE IS 3 PHASE. HOW TO CALICULATE THE LOAD? 3 PHASE SIDE EITHER dC SIDE. PLEASE SUGGEST ME
What is the requirement of grounding the neutral of single phase generators on load? If the neutral is not grounded, what will be the effect?
1) What are your personal strength? 2) What are your personal areas of improvement? 3) What are your expectations from from a particular job? 4) what are your carrier objectives?
How time response of the system is divided?