Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / karthikeyan
Volume = ((D+d)/2)*B*L
= ((0.5+0.15)/2)*1.7*2
= 0.325*1.7*2
= 1.105 cubic meter
| Is This Answer Correct ? | 45 Yes | 68 No |
Post New Answer View All Answers
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
Define mirror?
Explain moment of inertia?
what is diversion?
what r you reqired for concrete baching plant?
what is the maximum number of course that can be laid according to IS code and the max height.
what is the use in canals of longitudinal drains and cross drains in lining areas?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
What is Joule Brayton Cycle?
Rate analysis of Vitrified tile in cement mortor 1:3
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
how to clculate the %of concrete strenght achive after curing?load