Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / karthikeyan
Volume = ((D+d)/2)*B*L
= ((0.5+0.15)/2)*1.7*2
= 0.325*1.7*2
= 1.105 cubic meter
| Is This Answer Correct ? | 45 Yes | 68 No |
Post New Answer View All Answers
How much cement,sand,bricks and water needed for 1square metre brick work?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What is aggregate?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
If specific gravity of cement is less than 3.15 what is the cause?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
How much time Required for PPR pipe network testing
it is possiblee to produce concrete with out cracks...
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
what is the difference between tsp & tower
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
why +1 to be followed for calculating the no of bars in BBS. Please explain