Is 456 revised lastly in which year? & What are the revisions?
Answer Posted / umesh
2005
| Is This Answer Correct ? | 4 Yes | 40 No |
Post New Answer View All Answers
Explain what is change order request?
Please design 12.5m long dubbly beam
What is the Hardness of M-40 grade concrete, general and theoratical
Why should you show Client/Engineer activities clearly on the project plan?
what is BPM in concrete demolition hammers. what is better a higher value or lower
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
How will you Engage Labours on Site?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
What is packing Factor ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
How do you convert wind speed into force?