Answer Posted / kanta prasad
1.6
| Is This Answer Correct ? | 2 Yes | 10 No |
Post New Answer View All Answers
Why is concrete cube test carried out?
why are you joining in this (applied post) job and your aim for this job
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
whats is difference between anchorage length and development length
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
for pretensioning which will yield first and same for post tensioning?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
How many mortar required for Brickwork of 1 Cu.m works??
what is tension & compression of steel bending.
Why concrete barriers have curved surface profiles?
What are the applications of the modulus of elasticity?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?