Answer Posted / guest
In V model there is two-part verification and validation.
In verification it will check weather the system as per SRS
and get it scope or not.
In validation it will check weather the system working as
per SRS and FS or not.
In this Model on every stage simultaneous testing i.e.
verification will be done
As first use case design verification will be UAT.
In SRS and FS verification will again test SRS and FS.
In design the tester will have Design Testing.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What r the documents required for performance testing
i have source and target having same data structure 500 fields and one lacks records. how to validate data. write 5 scenarios.
qtp9.2 and qtp10.0 difference
What are the RBI rules has to follow by a bank for online precesseing. ?
What is a defect?
Describe your experiences with code analyzers.
Hi guys,I have 3+ years of exp in manual testing in a bangalore based MNC company.I Like to jump in chennai.So please if u know any jobs in chennai firms please let me know in my email-id. anbarasu2k@rediffmail.com. cheers, anbarasu.
how agile testing is performed and what are the related documents.
I studied MBA, I want learn any softwarecourse, which course is better hadoop or testing tools(manual+selenium?)
What is a maturity level?
What is fuzz testing?
When did u complete testing ? Which scenrio should not be in automation testing ? why ?
What is function points??????
What is sanity?
What are the differences between stlc and sdlc?