Answer Posted / praveen yadav
For this question, your answer should list out strengths
that you feel are relevant to the job. Given below are some
answers which could help you with your answers. However,
structure them to suit your requirements.
I have good co-ordination skills
Good analytical skills
I can persuade people to see my point of view, and get the
work done
My greatest asset is my ability to motivate people
Even during emergencies, I do not loose my cool
I have good entrepreneurial skills
I have consistently met my deadlines and targets
Can say “no” to people when required to do so!
I am very co-operative with my sub-ordinates, and would like
to see them grow
I am a good team player
I am very flexible, and have the ability to work hard under
difficult work conditions
I have the experience and knowledge relevant to this job
(Here, give appropriate details and examples)
| Is This Answer Correct ? | 32 Yes | 1 No |
Post New Answer View All Answers
How do you calculate the unit weight of concrete?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Which percentage of carpet area use in plot area of office building.
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
types of piles detail,
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
why we use 19x9x9and 20x10x10 but not other
How much cement and sand required for 9"brick wall per square metre
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
what is the minimum compressive strength of clay brick
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
Explain why concrete barriers have curved surface profiles?
how clculate excavated or backfilling quantity by simpson's rule
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?